TPM for the Lean Factory: Innovative Methods and Worksheets for Equipment Management

TPM for the Lean Factory: Innovative Methods and Worksheets for Equipment Management

Publisher: PRODUCTIVITY PRESS
ISBN: 9781563271915
Author: Keisuke Arai, Kenichi Sekine
Dispatch Time: 2 - 3 Days
Format: Hard Cover
Number of Pages: 338
Year of Published: 1998
Our Price: £63.99

Lean manufacturing cannot happen in a factory that lacks dependable, effective equipment. Breakdowns and processing defects translate into excess work-in-process and finished inventory, kept on hand "just in case." Recurring minor stoppages force employees to watch automated equipment that should run by itself. TPM gives a framework for addressing such problems, but many companies implement TPM at a superficial level, and the resulting productivity gains fall short of their potential. If your TPM implementation has resulted in posters and logos rather than a rise of productivity, how are you addressing this halt of progress? In TPM for the Lean Factory, authors Sekine and Arai teach you to identify and attack the key equipment-related problems and misunderstandings that make plants miss their lean manufacturing goals.

Written for companies with a basic TPM framework already in place, you'll learn three powerful approaches for cutting this waste:

  • The new 5Ss: focusing on standard locations and labeling through the first 2Ss
  • Instant maintenance: mastering quick repairs of minor equipment failures
  • Improved setup operations: organizing the preparation to save time and prevent errors

Chapters on cell design, product and process quality factor testing, and daily equipment inspection give you additional weapons for fighting waste and low productivity. For practical application, an implementation overview summarizes the steps for each topic, keyed to a set of 50 adaptable worksheets and examples. A practical and supportive resource, TPM for the Lean Factory extends a fresh vision and focus to help you get top results from your TPM efforts.

Table of Contents

  1. The Seven Types of Waste in TPM
  2. The 5S's Begin with 2Ss
  3. A New 5S Example: Mynac Company Case Study
  4. The Fundamentals of Instant Maintenance
  5. A Case Study in Instant Maintenance
  6. Improving Setup Operations
  7. Eliminating the Waste of Planned Downtime
  8. Eliminating Abnormalities within the Process
  9. Promoting Daily Equipment Inspections
  10. Test Yourself: A Lean TPM Quiz
  11. Implementation Overview for TPM Innovation
  12. Worksheets for TPM Innovation

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad           Good

Enter the code in the box below:



Tags: book
Price subject to change without notice
Copyright © 2014 Engineering Standards Bureau. All Rights Reserved.
Developed By Zoom Into Web