Your shopping cart is empty!
Quantity:
-
1 SCOPE This standard (Part 2) gives guidance on production programming and its relationship to corporate and business programmed and planning techniques such as master production schedules and capacity planning. 2 REFERENCES The following standards contain provisions which, through reference in the text, constitute provisions of this standard. IS No. Title IS 15446 Guide to production control: (Part 1): 2004 Introduction (Part 3): 2004 Ordering methods (Part 4): 2004 Dispatching (shop-floor control) (Part 5): 2004 The relationship between control and other management functions (Part 6): 2004 Computer aided production control